Skip to Content

Tunnel of TreesMichigan highway M-119 sign, a black-and-white diamondGrateful for This Road

Thanksgiving is November 26. Gather, then go for a drive.



The Tunnel of Trees, M-119

The Tunnel of Trees is the narrow, winding stretch of M-119 that follows the Lake Michigan shoreline from Harbor Springs through Good Hart to Cross Village in Emmet County, northern Michigan. Along the way you’ll find farms, shops, restaurants, places to stay, and nature preserves protected by the Little Traverse Conservancy.

Know before you go

You still cannot drive the entire route uninterrupted. M-119 remains closed to through traffic south of Division Road, between Good Hart and Cross Village, with a detour on Island View Road and North State Road. Local access to homes and businesses is maintained. Winter brings snow and ice to this narrow, winding road, so drive slowly, respect barricades, and check current conditions before traveling.

Map of the Cross Village detour and Tunnel of Trees suggested scenic route, September 2026Peninsulas gift shop logo, with pines and a bridge
Map provided by Peninsulas in Cross Village.
Note: This map is from September and is out of date. Devil’s Elbow reopened on October 30, 2026. The only remaining closure is south of Division Road.

Open this winter along M-119

Winter on the Tunnel of Trees is quiet, snowy and still beautiful. Some favorite stops close until spring, but these stops along the drive are open.

Historic brick building that houses Petoskey Brewing Co.

Petoskey Brewing

Craft beer and a full menu in an 1898 brewery building on M-119, where the drive begins.

Hours: Daily 11:30–9. Kitchen closes at 8:30.

Directions: Apple Maps · Google Maps

Bar and dining room inside Vernales Restaurant in Harbor Springs

Vernales

A sit-down lunch or dinner on M-119 before you head up the Tunnel of Trees.

Hours: Sun–Thu 11:30–8:30, Fri–Sat 11:30–9:30.

Directions: Apple Maps · Google Maps

Tunnel of Trees logo, a placeholder until we have a photo of Polish Kitchen

Polish Kitchen

Family-run since 2010: pierogi, gołąbki, kielbasa and a Polish pastie, by the Harbor Springs airport.

Hours: Mon–Fri 10–3. Closed weekends.

Directions: Apple Maps · Google Maps

Pond Hill Farm market stand with pumpkins and a rustic wooden building

Pond Hill Farm

Year-round farm on M-119: café and pizza, market, farm animals, and groomed snowshoe and ski trails.

Hours: Thu–Fri 4–8, Sat 12–8, Sun 12–6. Hours may change, so check before you go.

Directions: Apple Maps · Google Maps

Good Hart General Store, a red-and-white shop with bunting and shoppers outside

Good Hart General Store

Open year-round since 1934: pot pies, bakery, groceries, gifts and the post office.

Hours: Sun–Thu 10–5, Fri–Sat 10–6. Kitchen closed Mondays.

Directions: Apple Maps · Google Maps

Three Pines Studio & Gallery, a wood-sided studio with fall mums and pumpkins, in Cross Village

Three Pines Studio

A working studio and gallery of Northern Michigan art, with a winter exhibit through March 1.

Hours: Nov–Dec: Fri–Sat 11–5. Jan–mid-May: by appointment, (231) 526-9447.

Directions: Apple Maps · Google Maps

More open this winter

See everything open this winter

Hours checked Nov 16, 2026, and they can change with weather and holidays. Call ahead before a special trip.

A road to recovery

Spring rain and snowmelt caused major washouts along M-119 in April 2026. Additional flooding in June brought further damage. Today, the Tunnel of Trees remains open in sections, with detours connecting visitors and residents around the closures.

Read the storm history and recovery overview — Scenic Heritage Route Committee

Support our communities

The road damage affects more than a scenic drive, it affects the people who live and work here. Businesses around Harbor Springs, Good Hart, and Cross Village remain accessible, though routes vary. Call ahead, plan your stops, and keep supporting local shops, restaurants, farms, and galleries.

Follow the recovery

MDOT reopened M-119 at Devil’s Elbow on October 30, 2026, after slope stabilization and drainage repairs. Earlier repairs reopened sections near Stutsmanville Road, Middle Village Road, South Lamkin Road, and Horseshoe Bend. The Division Road closure is expected to remain at least through 2027, and MDOT has begun a corridor-wide resiliency study. Follow along for repair updates and news from the communities along M-119.

Read MDOT’s September 3, 2026 repair and reopening update

Information reviewed November 15, 2026. Road conditions and access may change. Check MDOT and county updates before traveling.